Jackmoor Cottage Upton Pyne Exeter EX5 5HY Data via plota.co.uk

26/0825/FUL - Full Application Approved

Proposal

Demolish single story extension on N/E elevation, construction of single storey extension on N/E elevation; replacement windows and external doors throughout and 2no. new windows on N/E elevation Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
15 Jun 2026
Approved
19 Aug 2026

Approved on 19 Aug 2026 · Delegated Decision · Last checked 20 Aug 2026

Site constraints 4

Grade II listed: Jackmoor Cottage
List entry 1317916 · 1 m from the pin
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Full Application
Postcode
EX5 5HY
Received
15 Jun 2026
Validated
15 Jun 2026
Ward
Exe Valley
Parish
Upton Pyne
Decision
Approval with conditions
Decision date
19 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
New British Design

How this decision compares

Decided in 65 days from validation, 14 days slower than East Devon's median of 51 for demolitions. Approved, as 93% of demolitions here are.

67%decided within 8 weeks
93%approved
108decided in the last year

Plota live figures for demolitions decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 20 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14828847
Site or press notice
24 Jun 2026
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026