12 Malcolm Road, Chandler's Ford, Eastleigh, SO53 5BG Data via plota.co.uk

Valid T/26/101658 - Consent under Tree Preservation Orders
Date received
30 Jun 2026
Date validated
30 Jun 2026
Postcode
SO53 5BG
Type
Consent under Tree Preservation Orders

Description

1no. Beech (T1) - Crown reduction by up to 3m from branch tips throughout the crown, maintaining natural shape and balanced form. Removal of dead, diseased, damaged and crossing branches where appropriate. 1no. Oak (T2) - Crown reduction by up to 3.5m from branch tips throughout the crown, with particular attention to reducing the lateral spread towards property while maintaining the tree’s natural shape and balanced form. Removal of dead, diseased, damaged and crossing branches where appropriate. T1 & T2 have reached maturity and now have extensive crowns, measuring approx. 18m and 16m in spread respectively. The size and density of the canopies result in significant overshadowing of the rear garden and rear elevation of the property, substantially reducing natural daylight and limiting the reasonable enjoyment and use of the garden. T2 is situated approx. 4m from the rear elevation of the property and, because of its proximity, has a greater impact on daylight reaching both the house and the immediate garden area. A slightly greater crown reduction is requested to improve light penetration while retaining its natural form, health and amenity value. The proposed works represent sympathetic management of two mature trees and are intended to maintain them as healthy, structurally sound specimens in accordance with BS3998:2010. Data via plota.co.uk

Last checked

Decision outlook

Plota predicted a decision around 13 Sept 2026; it is now day 75.

Day 75, past the statutory target. 99% of tree works in Eastleigh are decided within thirteen weeks, which runs to 29 Sept 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 11 Sept 2026.

Day 7519 days past the 56-day target
91%decided within 8 weeks
92%approved
188decided in the last year

Plota live figures for tree works decided by Eastleigh in the last twelve months, from validation. Eastleigh decision record →

Site constraints 2

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Inside the Chandler's Ford built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Eastleigh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Eastleigh
Planning Authority Score
6.8/10
Good
#67 of 296 councils
Relevant to this application:
Householder decisions

Eastleigh is faster than most councils at deciding householder applications, ranking #94 out of 296. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Eastleigh decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #111 of 296
92%
Householder approved
Above avg (90%) #153 of 296
73%
Decided in 8 weeks
Above avg (63%) #94 of 296
27%
Extended time limit
Below avg (41%) #40 of 296
63%
Minor dwellings approved
30 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
91%
Change of use approved
11 decided
547
Total decisions
55 refused in the year to March 2026