Morrisons Car Park James Watt Way Erith Kent DA8 2AH Data via plota.co.uk

26/00808/FUL - Detailed Planning Application Approved

Proposal

Installation of charging zone, erection of EV chargers, sub-station enclosure, LV panel, meter cabinet, floodlights and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
23 Apr 2026
Consultation
18 Jun 2026
Approved
18 Jun 2026

Approved on 18 Jun 2026 · Last checked 5 Jul 2026

Site constraints 6

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Bexley AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Erith
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Bexley built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bexley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bexley
Application type
Detailed Planning Application
Postcode
DA8 2AH
Received
23 Apr 2026
Validated
23 Apr 2026
Ward
ERITH
Case officer
Show
Target decision
18 Jun 2026
Decision
Permission Granted with Conditions
Decision date
18 Jun 2026
Applicant
Show

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 89% of full applications here are.

80%decided within 8 weeks
89%approved
558decided in the last year

Plota live figures for full applications decided by Bexley in the last twelve months, from validation. Bexley decision record →

Consultation & key dates

Alt. reference
PP-14882298
Neighbours
28 Apr 2026
Consultation
18 Jun 2026
Comments by
19 May 2026
Site or press notice
29 Apr 2026
Env. assessment
No
Bexley
Planning Authority Score
8.9/10
Excellent
#5 of 296 councils
Relevant to this application:
Householder decisions

Bexley is one of the fastest councils in England for householder decisions, ranking #17 out of 296. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bexley decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #106 of 296
95%
Householder approved
Above avg (90%) #69 of 296
89%
Decided in 8 weeks
Above avg (63%) #17 of 296
20%
Extended time limit
Below avg (41%) #17 of 296
69%
Minor dwellings approved
124 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
58%
Change of use approved
90 decided
1,324
Total decisions
133 refused in the year to March 2026