38 Grosvenor Square London W1K 2HW Data via plota.co.uk

26/04400/LBC - Listed Building Consent Application Pending

Proposal

Refurbishment and redevelopment of the site to provide a hotel (Use Class C1) with associated ancillary facilities, including the demolition of the existing rear wing and the erection of a new rear wing extension with roof pavilion, construction of a basement, and associated servicing, cycle parking, and landscaping works. (Linked with 26/04399/FULL) Data via plota.co.uk

View original council record ↗

Application progress

Received
2 Jul 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet.

Documents 112

Plans & drawings 59

PDF DELIVERY AND SERVICING MANAGEMENT PLAN Background Papers · 2 Jul 2026 View ↗ PDF OPERATIONAL MANAGEMENT PLAN Drawing · 2 Jul 2026 View ↗ PDF TRAVEL PLAN Background Papers · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION LEVEL 00 PLAN Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION LEVEL 01 PLAN Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION LEVEL 02 PLAN Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION LEVEL 03 PLAN Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION LEVEL 04 PLAN Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION LEVEL L0 PLAN Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION NORTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION EAST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION SOUTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION WEST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION SECTION A-A Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION SECTION B-B Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION SECTION C-C Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION SECTION D-D Drawing · 2 Jul 2026 View ↗ PDF DEMOLITION SECTION E-E Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING LEVEL 00 PLAN Drawing · 2 Jul 2026 View ↗ PDF EXISTING LEVEL 01 PLAN Drawing · 2 Jul 2026 View ↗ PDF EXISTING LEVEL 02 PLAN Drawing · 2 Jul 2026 View ↗ PDF EXISTING LEVEL 03 PLAN Drawing · 2 Jul 2026 View ↗ PDF EXISTING LEVEL 05 ROOF PLAN Drawing · 2 Jul 2026 View ↗ PDF EXISTING LEVEL L0 PLAN Drawing · 2 Jul 2026 View ↗ PDF EXISTING NORTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF EXISTING EAST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF EXISTING SOUTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF EXISTING WEST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF EXISTING SECTION A-A Drawing · 2 Jul 2026 View ↗ PDF EXISTING SECTION B-B Drawing · 2 Jul 2026 View ↗ PDF EXISTING SECTION C-C Drawing · 2 Jul 2026 View ↗ PDF EXISTING SECTION D-D Drawing · 2 Jul 2026 View ↗ PDF FAN COIL UNIT INTEGRATION TYPICAL DETAILS Drawing · 2 Jul 2026 View ↗ PDF GSHP BOREHOLE LAYOUT OPTION A (5M SCHEME) Drawing · 2 Jul 2026 View ↗ PDF GSHP SCHEMATIC Drawing · 2 Jul 2026 View ↗ PDF DRY RISER SCHEMATIC Drawing · 2 Jul 2026 View ↗ PDF GROUND FLOOR MAIN PLANT Drawing · 2 Jul 2026 View ↗ PDF TYPICAL RISER REQUIREMENTS Drawing · 2 Jul 2026 View ↗ PDF BASEMENT PLANT ROOM Drawing · 2 Jul 2026 View ↗ PDF LOWER GROUND FLOOR MAIN PLANT Drawing · 2 Jul 2026 View ↗ PDF PROPOSED SITE PLAN Drawing · 2 Jul 2026 View ↗ PDF PROPOSED LEVEL 00 PLAN Drawing · 2 Jul 2026 View ↗ PDF PROPOSED LEVEL 01 PLAN Drawing · 2 Jul 2026 View ↗ PDF PROPOSED LEVEL 02 PLAN Drawing · 2 Jul 2026 View ↗ PDF PROPOSED LEVEL 03 PLAN Drawing · 2 Jul 2026 View ↗ PDF PROPOSED LEVEL 04 PLAN Drawing · 2 Jul 2026 View ↗ PDF PROPOSED LEVEL 05 PLAN Drawing · 2 Jul 2026 View ↗ PDF PROPOSED LEVEL B1 PLAN Drawing · 2 Jul 2026 View ↗ PDF PROPOSED LEVEL L0 PLAN Drawing · 2 Jul 2026 View ↗ PDF PROPOSED NORTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF PROPOSED EAST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF PROPOSED SOUTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF PROPOSED WEST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF PROPOSED SECTION A-A Drawing · 2 Jul 2026 View ↗ PDF PROPOSED SECTION B-B Drawing · 2 Jul 2026 View ↗ PDF PROPOSED SECTION C-C Drawing · 2 Jul 2026 View ↗ PDF PROPOSED SECTION D-D Drawing · 2 Jul 2026 View ↗ PDF PROPOSED SECTION E-E Drawing · 2 Jul 2026 View ↗ PDF SITE LOCATION PLAN Drawing · 2 Jul 2026 View ↗

Other documents 32

PDF RECEIPT OF APPLICATION Other · 6 Jul 2026 View ↗ PDF ATTACHMENTSUMMARY Background Papers · 2 Jul 2026 View ↗ PDF ARCHAEOLOGICAL DESK-BASED Background Papers · 2 Jul 2026 View ↗ PDF BREEAM UK RFO BESPOKE 2014_ PRELIM Background Papers · 2 Jul 2026 View ↗ PDF CODE OF CONSTRUCTION PRACTICE APPENDIX A CHECKLIST Background Papers · 2 Jul 2026 View ↗ PDF CONTRACTOR REQUIREMENTS-BREEAM 2014 BESPOKE Background Papers · 2 Jul 2026 View ↗ PDF COVER LETTER_1 JULY 2026 Background Papers · 2 Jul 2026 View ↗ PDF DAYLIGHT AND SUNLIGHT REPORT Background Papers · 2 Jul 2026 View ↗ PDF MEP REPORT Background Papers · 2 Jul 2026 View ↗ PDF OPERATIONAL WASTE MANAGEMENT STRATEGY Background Papers · 2 Jul 2026 View ↗ PDF OVERHEATING ANALYSIS Background Papers · 2 Jul 2026 View ↗ PDF PART_L_2021_GLA_CARBON_EMISSION FINAL Background Papers · 2 Jul 2026 View ↗ PDF PRE DEMOLITION AUDIT Background Papers · 2 Jul 2026 View ↗ PDF UGF CALCULATOR Background Papers · 2 Jul 2026 View ↗ PDF WHOLE LIFE CARBON REPORT Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_1 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_2 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_3 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_4 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_5 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_6 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_7 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_8 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_9 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_10 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION REPORT _PART_11 Background Papers · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT_COMPRESSED-1 Background Papers · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT_COMPRESSED-2 Background Papers · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT_COMPRESSED-3 Background Papers · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT_COMPRESSED-4 Background Papers · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT_COMPRESSED-5 Background Papers · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT_COMPRESSED-6 Background Papers · 2 Jul 2026 View ↗

All documents on the council site ↗

Important details

Application type
Listed Building Consent Application
Postcode
W1K 2HW
Received
2 Jul 2026
Validated
2 Jul 2026
Ward
West End
Case officer
Track to view
Target decision
27 Aug 2026
Agent
Harriet Young

Consultation & key dates

Alt. reference
PP-14961523
Env. assessment
No
Westminster
Planning Authority Score
3.7/10
Below average
#209 of 292 councils
Relevant to this application:
Other decisions

Westminster is slower than most councils at deciding householder applications, ranking #227 out of 292. Only 27% of applications have the time limit extended, well below the 40% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.

One of the strictest councils
only 79% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision performance
Based on MHCLG data, 2025
86%
Overall approval rate
Below avg (87%) #200 of 292
79%
Householder approved
Below avg (90%) #279 of 292
53%
Decided in 8 weeks
Below avg (64%) #227 of 292
27%
Extended time limit
Below avg (40%) #43 of 292
86%
Minor dwellings approved
14 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
86%
Change of use approved
140 decided
4,828
Total decisions
669 refused in 2025