26/04399/FULL - Full Planning Permission Application Pending

Proposal

Refurbishment and redevelopment of the site to provide a hotel (Use Class C1) with associated ancillary facilities, including the demolition of the existing rear wing and the erection of a new rear wing extension with roof pavilion, construction of a basement, and associated servicing, cycle parking, and landscaping works. (Linked with 26/04400/LBC) Data via plota.co.uk

View original council record ↗

Application progress

Received
2 Jul 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet.

Documents 109

Statements & assessments 28

PDF DESIGN AND ACCESS STATEMENT: PART 1 Design and Access Statement · 2 Jul 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 2 Design and Access Statement · 2 Jul 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 4 Design and Access Statement · 2 Jul 2026 View ↗ PDF AIR QUALITY ASSESSMENT Air quality assessment · 2 Jul 2026 View ↗ PDF ARCHAEOLOGICAL DESK-BASED ASSESSMENT Background Papers · 2 Jul 2026 View ↗ PDF BNG EXEMPTION STATEMENT Background Papers · 2 Jul 2026 View ↗ PDF PRELIMINARY BREEAM ASSESSMENT Background Papers · 2 Jul 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Economic statement · 2 Jul 2026 View ↗ PDF DAYLIGHT AND SUNLIGHT REPORT Daylight and Sunlight assessment · 2 Jul 2026 View ↗ PDF ENERGY ASSESSMENT Energy Assessment · 2 Jul 2026 View ↗ PDF FIRE SAFETY STATEMENT Background Papers · 2 Jul 2026 View ↗ PDF FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT Flood risk assessment · 2 Jul 2026 View ↗ PDF HERITAGE IMPACT ASSESSMENT Heritage Statement · 2 Jul 2026 View ↗ PDF NOISE IMPACT ASSESSMENT REPORT Noise impact assessment · 2 Jul 2026 View ↗ PDF OPERATIONAL ENERGY Energy Assessment · 2 Jul 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Statement of Community Involvement · 2 Jul 2026 View ↗ PDF SUSTAINABILITY STATEMENT Background Papers · 2 Jul 2026 View ↗ PDF TOWNSCAPE REPORT Heritage Statement · 2 Jul 2026 View ↗ PDF TRANSPORT STATEMENT Transport Statement · 2 Jul 2026 View ↗ PDF URBAN GREENING FACTOR ASSESSMENT Background Papers · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT: PART 1 Construction Management Plan · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT: PART 2 Construction Management Plan · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT: PART 3 Construction Management Plan · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT: PART 4 Construction Management Plan · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT: PART 5 Construction Management Plan · 2 Jul 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT: PART 6 Construction Management Plan · 2 Jul 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT: PART 3 Design and Access Statement · 2 Jul 2026 View ↗ PDF PLANNING STATEMENT Planning Statement · 2 Jul 2026 View ↗

Plans & drawings 59

PDF DELIVERY AND SERVICING MANAGEMENT PLAN Background Papers · 2 Jul 2026 View ↗ PDF OPERATIONAL MANAGEMENT PLAN Background Papers · 2 Jul 2026 View ↗ PDF TRAVEL PLAN Travel Plan · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION LEVEL 00 PLAN Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION LEVEL 01 PLAN Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION LEVEL 02 PLAN Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION LEVEL 03 PLAN Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION LEVEL 04 PLAN Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION LEVEL L0 PLAN Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION DEMOLITION NORTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION DEMOLITION EAST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION DEMOLITION SOUTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION DEMOLITION WEST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION DEMOLITION SECTION A-A Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION DEMOLITION SECTION B-B Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION DEMOLITION SECTION C-C Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION DEMOLITION SECTION D-D Drawing · 2 Jul 2026 View ↗ PDF 02-PLANNING DEMOLITION DEMOLITION SECTION E-E Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING LEVEL 00 PLAN Drawing · 2 Jul 2026 View ↗ PDF GSQ-DAA-ZZ-01-DR-A-PL01101_P02 Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING LEVEL 02 PLAN Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING LEVEL 03 PLAN Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING LEVEL 05 ROOF PLAN Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING LEVEL L0 PLAN Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING EXISTING NORTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING EXISTING EAST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING EXISTING SOUTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING EXISTING WEST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING EXISTING SECTION A-A Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING EXISTING SECTION B-B Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING EXISTING SECTION C-C Drawing · 2 Jul 2026 View ↗ PDF 01-PLANNING EXISTING EXISTING SECTION D-D Drawing · 2 Jul 2026 View ↗ PDF FAN COIL UNIT INTEGRATION TYPICAL DETAILS Drawing · 2 Jul 2026 View ↗ PDF GSHP BOREHOLE LAYOUT OPTION A (5M SCHEME) Drawing · 2 Jul 2026 View ↗ PDF GSHP SCHEMATIC Drawing · 2 Jul 2026 View ↗ PDF DRY RISER SCHEMATIC Drawing · 2 Jul 2026 View ↗ PDF GROUND FLOOR MAIN PLANT Drawing · 2 Jul 2026 View ↗ PDF TYPICAL RISER REQUIREMENTS Drawing · 2 Jul 2026 View ↗ PDF BASEMENT PLANT ROOM Drawing · 2 Jul 2026 View ↗ PDF LOWER GROUND FLOOR MAIN PLANT Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED SITE PLAN Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED LEVEL 00 PLAN Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED LEVEL 01 PLAN Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED LEVEL 02 PLAN Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED LEVEL 03 PLAN Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED LEVEL 04 PLAN Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED LEVEL 05 PLAN Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED LEVEL B1 PLAN Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED LEVEL L0 PLAN Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED PROPOSED NORTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED PROPOSED EAST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED PROPOSED SOUTH ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED PROPOSED WEST ELEVATION Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED PROPOSED SECTION A-A Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED PROPOSED SECTION B-B Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED PROPOSED SECTION C-C Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED PROPOSED SECTION D-D Drawing · 2 Jul 2026 View ↗ PDF 03-PLANNING PROPOSED PROPOSED SECTION E-E Drawing · 2 Jul 2026 View ↗ PDF SITE LOCATION PLAN Location Plan · 2 Jul 2026 View ↗

Other documents 21

PDF RECEIPT OF APPLICATION Other · 6 Jul 2026 View ↗ PDF CONTRACTOR?S REQUIREMENTS Background Papers · 2 Jul 2026 View ↗ PDF COVER LETTER Background Papers · 2 Jul 2026 View ↗ PDF MEP REPORT Report · 2 Jul 2026 View ↗ PDF OPERATIONAL WASTE MANAGEMENT STRATEGY Background Papers · 2 Jul 2026 View ↗ PDF OVERHEATING ANALYSIS Background Papers · 2 Jul 2026 View ↗ PDF PART L 2021 GLA CARBON EMISSION FINAL Background Papers · 2 Jul 2026 View ↗ PDF PRE-DEMOLITION AUDIT Background Papers · 2 Jul 2026 View ↗ PDF UGF CALCULATOR Background Papers · 2 Jul 2026 View ↗ PDF WHOLE LIFE CARBON FOR RIBA STAGE 2 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 1 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 2 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 3 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 4 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 5 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 6 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 7 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 8 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 9 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 10 Background Papers · 2 Jul 2026 View ↗ PDF DESK STUDY AND GROUND INVESTIGATION: PART 11 Background Papers · 2 Jul 2026 View ↗

All documents on the council site ↗

Important details

Application type
Full Planning Permission Application
Postcode
W1K 2HW
Received
2 Jul 2026
Validated
2 Jul 2026
Ward
West End
Case officer
Track to view
Target decision
27 Aug 2026
Agent
Harriet Young

Consultation & key dates

Env. assessment
No
Westminster
Planning Authority Score
3.7/10
Below average
#209 of 292 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #227 out of 292. Only 27% of applications have the time limit extended, well below the 40% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.

One of the strictest councils
only 79% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision performance
Based on MHCLG data, 2025
86%
Overall approval rate
Below avg (87%) #200 of 292
79%
Householder approved
Below avg (90%) #279 of 292
53%
Decided in 8 weeks
Below avg (64%) #227 of 292
27%
Extended time limit
Below avg (40%) #43 of 292
86%
Minor dwellings approved
14 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
86%
Change of use approved
140 decided
4,828
Total decisions
669 refused in 2025