Hebden Bridge Railway Station Station Road Hebden Bridge Calderdale HX7 6JE

Pending Consideration 26/00193/LBC
Council
Date received
3 Mar 2026
Date validated
30 Mar 2026
Postcode
HX7 6JE

Description

Create cold store in the station waiting room. For security reasons, a portion of the room would need to be partitioned off to house the cold store unit. However a large part of the room would remain available for use by the travelling public, which has given approval by Northern. A small hole would be need to cut in the wall between the waiting and the bar, in order for the pipework to pass through, however this would not need to be very large, and could potentially be filled in and plastered over should the bar use cease. In order to provide access to the drain situated outside the bar room adjacent to the waiting room, a small opening would need to be created in the wall under the window as to allow a water waste pipe to join the drainage facility. Whilst the introduction of partitioning into the current waiting room would have an impact on that space, it would not really impact upon the external appearance of the listed building. Both the proposed cutting of small holes and the introduction of the partition into the waiting room would be reversible, and that the limited harm that they would cause to the listed building would be more than outweighed by the benefit of giving the building a viable use which would provide enhanced facilities for rail passengers and visitors to Hebden Bridge.

Calderdale
Planning Authority Score
2.8/10
Poor
#239 of 292 councils
Relevant to this application:
Householder decisions

Calderdale ranks #178 out of 292 councils for householder decision speed. 49% of applications have the time limit extended, above the 40% national average. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Calderdale decision performance
Based on MHCLG data, 2025
85%
Overall approval rate
Below avg (87%) #204 of 292
86%
Householder approved
Below avg (90%) #233 of 292
60%
Decided in 8 weeks
Below avg (64%) #178 of 292
49%
Extended time limit
Above avg (40%) #218 of 292
74%
Minor dwellings approved
112 decided (1-9 homes)
85%
Major dwellings approved
20 decided (10+ homes)
82%
Change of use approved
60 decided
877
Total decisions
135 refused in 2025