102 Kentlea Road, London, SE28 0JZ Data via plota.co.uk

26/1494/F - Full Planning Permission Approved

Proposal

The proposal seeks planning permission for the change of use of an existing two-bedroom dwellinghouse (Use Class C3) to a children?s residential care home (Use Class C2). The home will provide accommodation and care for one child or young person aged between 9?16 years old with a learning disability (solo placement), supported by two staff on a 24-hour rota basis. The property will continue to function and appear as a family home within the local community. Staff will have access to a separate office and toilet facility. The child will benefit from dedicated living, dining, and outdoor amenity space for recreation. No major external alterations are proposed. The development will not increase the building?s size, height, or footprint. Existing parking, access, and garden arrangements will remain unchanged. In terms of transport and parking, the property benefits from two on-site parking spaces, with additional free on-street parking available. There are no parking permit restrictions, and the surrounding roads do not have yellow or red line controls, allowing for convenient access for staff and visitors. The proposed change of use aligns with the aims of the Royal Greenwich Local Plan: Core Strategy (2014), particularly policies CH1 (Cohesive and Healthy Communities) and H5 (Housing Design), which encourage developments that meet identified community and social care needs while maintaining neighbourhood character. The home will provide a stable, nurturing, and family-style environment for a child with learning disabilities who requires residential support, contributing positively to local care provision and fulfilling an important social function within the borough. The proposed use will have a low environmental and amenity impact, with staffing levels and activity comparable to that of a small household. The 24-hour staff presence will ensure the property is well managed, quiet, and respectful of the surrounding community. In summary, the proposal represents an appropriate and sensitive change of use from C3 to C2, consistent with the residential character of the area, and supports Greenwich Council?s commitment to inclusive, high-quality care for children and young people with additional needs. The site is located within reach of local services and public transport options. Staff and visitors will be encouraged to use sustainable modes of travel where practical, including walking, cycling, car sharing and public transport. The proposed use would not result in any significant increase in traffic generation or parking demand. There is sufficient parking available in the local area, including: Two free car parks; Free on-street parking; No yellow line restrictions; No red line restrictions. The existing highway network can safely accommodate the limited vehicle movements associated with the proposal. Parking can be managed without causing obstruction, congestion or harm to neighbouring amenity. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 May 2026
✓
Validated
27 Jul 2026
✓
Consultation
30 Jul 2026
✓
Approved
21 Sept 2026

Approved on 21 Sept 2026 · Delegation · Last checked 22 Sept 2026

Site constraints 7

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 708 m away: Thames Tideway Tunnel
The site is 708 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 21 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Greenwich built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £156,000 in July 2003. Terraced house, freehold.

4 July 2003£156,000
27 October 2000£97,995New build

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area62 m² (667 sq ft)
Energy ratingC (73 out of 100), could reach B
PropertyEnd-terrace house, 4 habitable rooms
Built2003 to 2006
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in December 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Full Planning Permission
Postcode
SE28 0JZ
Received
18 May 2026
Validated
27 Jul 2026
Ward
WEST THAMESMEAD
Parish
Woolwich & Thamesmead
Case officer
Show
Target decision
21 Sept 2026
Decision
Approve
Decision date
21 Sept 2026
Decision level
Delegation
Applicant
Show

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 43% of changes of use here are.

73%decided within 8 weeks
43%approved
114decided in the last year

Plota live figures for changes of use decided by Greenwich in the last twelve months, from validation. Greenwich decision record →

Public comments

No public comments yet.

Last counted 22 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14453340
Planning Portal ref
PP-14453340
Consultation
30 Jul 2026
Comments by
19 Aug 2026
Statutory expiry
21 Sept 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Change of use

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.