Hornbeam House Ayot St Peter Road Ayot St Peter Welwyn AL6 9BG Data via plota.co.uk
Granted
6/2026/0439/HOUSE
Description
Installation of ground floor timber casement window in connection with conversion of existing ground floor boiler room into a WC and utility room. Data via plota.co.uk
Historical activity at this location
6 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
2022
Approved
Submission of details pursuant to condition 2 (samples of materials) on planning applicat…
2022
Approved
Submission of details pursuant to condition 2 (samples of materials) on planning applicat…
2022
Approved
Erection of Garden Studio and replacement garage/shed
2022
Approved
Erection of Garden Studio and replacement garage/shed
2021
Approved
Listed building consent for replacement of two existing windows and one patio door
2021
Approved
Listed building consent for replacement of two existing windows and one patio door
Welwyn Hatfield
Planning Authority Score
2.1/10
Poor
#272 of 296 councils
Relevant to this application:
Householder decisions
Welwyn Hatfield is slower than most councils at deciding householder applications, ranking #224 out of 296. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).
Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application.
View full council performance
Welwyn Hatfield decision performance
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #200 of 296
86%
Householder approved
Below avg (90%) #246 of 296
53%
Decided in 8 weeks
Below avg (63%) #224 of 296
50%
Extended time limit
Above avg (41%) #229 of 296
84%
Minor dwellings approved
63 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
73%
Change of use approved
22 decided
633
Total decisions
87 refused in the year to March 2026
