Barleyfields Shipton Road Clifton York Data via plota.co.uk

26/00539/FULM - Major Full Application Awaiting decision

Proposal

Change of use of Ashbank from office space (use class E) to form 1no. dwelling (use class C3) following demolition of extensions, erection of apartment block comprising 5no. dwellings following demolition of Barleyfields and erection of 8no. dwellings to rear together with associated landscaping, drainage and access road… Data via plota.co.uk

View original council record ↗

Application progress

Received
26 Mar 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet. The consultation period closed on 14 Jul 2026.

Documents 98

Statements & assessments 23

PDF LEAD LOCAL FLOOD AUTHORITY Internal Responses · 28 Apr 2026 View ↗ PDF ENGINEERING LAYOUT Drainage Documentation · 23 Apr 2026 View ↗ PDF ENERGY STATEMENT Report · 23 Mar 2026 View ↗ PDF NOISE IMPACT ASSESSMENT Noise Impact Assessment · 23 Mar 2026 View ↗ PDF BAT SURVEY REPORT Report · 23 Mar 2026 View ↗ PDF BNG METRIC CALCULATION NO MACRO Report · 23 Mar 2026 View ↗ PDF TRANSPORT NOTE Transport Assessment · 23 Mar 2026 View ↗ PDF ARCHAEOLOGY & HERITAGE DESK BASED ASSESSMENT Report · 23 Mar 2026 View ↗ PDF AIR QUALITY ASSESSMENT Air Quality Assessment · 23 Mar 2026 View ↗ PDF EXISTING & PROPOSED IMPERMEABLE AREAS & DISCHARGE RATES Drainage Documentation · 23 Mar 2026 View ↗ PDF ADOPTABLE MANHOLE SCHEDULE Drainage Documentation · 23 Mar 2026 View ↗ PDF PRIVATE MANHOLE SCHEDULE Drainage Documentation · 23 Mar 2026 View ↗ PDF LONGSECTIONS Drainage Documentation · 23 Mar 2026 View ↗ PDF EARTHWORKS ANALYSIS DIRECT COMPARISON Drainage Documentation · 23 Mar 2026 View ↗ PDF FLOOD RISK & COMPENSATORY STORAGE ANALYSIS Drainage Documentation · 23 Mar 2026 View ↗ PDF CONSTRUCTION NOISE & VIBRATION MANAGEMENT PLAN Report · 23 Mar 2026 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL & BNG ASSESSMENT Report · 23 Mar 2026 View ↗ PDF PHASE 1 ENVIRONMENTAL ASSESSMENT REPORT Report · 23 Mar 2026 View ↗ PDF PHASE II GEO-ENVIRONMENTAL SITE INVESTIGATION & RISK ASSESSMENT Report · 23 Mar 2026 View ↗ PDF FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY Flood Risk Assessment · 23 Mar 2026 View ↗ PDF ARBORICULTURAL METHOD STATEMENT Report · 23 Mar 2026 View ↗ PDF DESIGN & ACCESS STATEMENT Design & Access Statement · 23 Mar 2026 View ↗ PDF PLANNING STATEMENT Planning Statement · 23 Mar 2026 View ↗

Plans & drawings 49

PDF VISIBILITY SPLAY Revised Drawing · 22 Jun 2026 View ↗ PDF PROPOSED SITE ELEVATIONS Revised Drawing · 22 Jun 2026 View ↗ PDF APARTMENTS PROPOSED PLANS LEVELS 01, 02 & ROOF Revised Drawing · 22 Jun 2026 View ↗ PDF HT01 PROPOSED PLANS & ELEVATIONS Revised Drawing · 22 Jun 2026 View ↗ PDF FIRE TENDER SWEPT PATH ANALYSIS Revised Drawing · 22 Jun 2026 View ↗ PDF APARTMENTS PROPOSED PLANS LEVEL 00 Revised Drawing · 22 Jun 2026 View ↗ PDF APARTMENTS PROPOSED ELEVATIONS Revised Drawing · 22 Jun 2026 View ↗ PDF HT02 PROPOSED PLANS & ELEVATIONS Revised Drawing · 22 Jun 2026 View ↗ PDF PROPOSED BOUNDARY TYPES Revised Drawing · 22 Jun 2026 View ↗ PDF PROPOSED SITE PLAN Revised Drawing · 22 Jun 2026 View ↗ PDF PROPOSED BOUNDARY PLAN Revised Drawing · 22 Jun 2026 View ↗ PDF REFUSE VEHICLE SWEPT PATH ANALYSIS Revised Drawing · 22 Jun 2026 View ↗ PDF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Report · 23 Mar 2026 View ↗ PDF ENGINEERING LAYOUT Superseded Drawing · 23 Mar 2026 View ↗ PDF CONSTRUCTION DUST MANAGEMENT PLAN Report · 23 Mar 2026 View ↗ PDF ASHBANK EXISTING PLANS LEVEL 01 Drawing · 23 Mar 2026 View ↗ PDF ASHBANK DEMOLITION PLANS LEVEL 01 Drawing · 23 Mar 2026 View ↗ PDF ASHBANK EXISTING PLANS LEVEL 02 Drawing · 23 Mar 2026 View ↗ PDF ASHBANK DEMOLITION PLANS LEVEL 02 Drawing · 23 Mar 2026 View ↗ PDF ASHBANK EXISTING PLANS ROOF LEVEL Drawing · 23 Mar 2026 View ↗ PDF ASHBANK DEMOLITION PLANS ROOF LEVEL Drawing · 23 Mar 2026 View ↗ PDF ASHBANK EXISTING ELEVATIONS 1 OF 2 Drawing · 23 Mar 2026 View ↗ PDF ASHBANK EXISTING ELEVATIONS 2 OF 2 Drawing · 23 Mar 2026 View ↗ PDF ASHBANK PROPOSED ELEVATIONS Drawing · 23 Mar 2026 View ↗ PDF ASHBANK EXISTING PLANS LEVELS B1 & 00 Drawing · 23 Mar 2026 View ↗ PDF ASHBANK DEMOLITION PLANS LEVELS B1 & 00 Drawing · 23 Mar 2026 View ↗ PDF ASHBANK PROPOSED PLANS LEVELS B1 & 00 Drawing · 23 Mar 2026 View ↗ PDF APARTMENTS PROPOSED ELEVATIONS Superseded Drawing · 23 Mar 2026 View ↗ PDF APARTMENTS PROPOSED PLANS LEVEL 00 Superseded Drawing · 23 Mar 2026 View ↗ PDF APARTMENTS PROPOSED PLANS LEVELS 01, 02 & ROOF Superseded Drawing · 23 Mar 2026 View ↗ PDF HT01 PROPOSED PLANS & ELEVATIONS Superseded Drawing · 23 Mar 2026 View ↗ PDF HT02 PROPOSED PLANS & ELEVATIONS Superseded Drawing · 23 Mar 2026 View ↗ PDF EXISTING SITE ELEVATIONS Drawing · 23 Mar 2026 View ↗ PDF PROPOSED SITE ELEVATIONS Superseded Drawing · 23 Mar 2026 View ↗ PDF PROPOSED BOUNDARY TYPES Superseded Drawing · 23 Mar 2026 View ↗ PDF DEMOLITION SITE PLAN Drawing · 23 Mar 2026 View ↗ PDF PROPOSED SITE PLAN Superseded Drawing · 23 Mar 2026 View ↗ PDF PROPOSED BOUNDARY PLAN Superseded Drawing · 23 Mar 2026 View ↗ PDF LOCATION PLAN Location Plan · 23 Mar 2026 View ↗ PDF EXISTING SITE PLAN Drawing · 23 Mar 2026 View ↗ PDF EXISTING TOPOGRAPHY PLAN Drawing · 23 Mar 2026 View ↗ PDF ASHBANK PROPOSED PLANS LEVELS 01, 02 & ROOF Drawing · 23 Mar 2026 View ↗ PDF BARLEYFIELDS EXISTING PLANS LEVEL 00 Drawing · 23 Mar 2026 View ↗ PDF BARLEYFIELDS EXISTING PLANS LEVEL 01 Drawing · 23 Mar 2026 View ↗ PDF BARLEYFIELDS EXISTING PLANS LEVEL 02 Drawing · 23 Mar 2026 View ↗ PDF BARLEYFIELDS EXISTING PLANS LEVEL 03 Drawing · 23 Mar 2026 View ↗ PDF BARLEYFIELDS EXISTING PLANS ROOF LEVEL Drawing · 23 Mar 2026 View ↗ PDF BARLEYFIELDS EXISTING ELEVATIONS 1 OF 2 Drawing · 23 Mar 2026 View ↗ PDF BARLEYFIELDS EXISTING ELEVATIONS 2 OF 2 Drawing · 23 Mar 2026 View ↗

All documents on the council site ↗

Work with planning data? Every application in York - and every UK council - as a live feed or API. About Plota's data service

Important details

Council
York
Application type
Major Full Application
Postcode
YO30 5RE
Received
26 Mar 2026
Validated
26 Mar 2026
Ward
Rawcliffe And Clifton Without
Parish
Clifton Planning Panel
Case officer
Show
Target decision
25 Jun 2026
Applicant
Show

Consultation & key dates

Alt. reference
PP-14783233
Env. assessment
No
York
Planning Authority Score
3.7/10
Below average
#213 of 296 councils
Relevant to this application:
Change of use

York ranks #156 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
York decision performance
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #255 of 296
87%
Householder approved
Below avg (90%) #237 of 296
64%
Decided in 8 weeks
Above avg (63%) #156 of 296
42%
Extended time limit
Above avg (41%) #168 of 296
69%
Minor dwellings approved
104 decided (1-9 homes)
71%
Major dwellings approved
17 decided (10+ homes)
63%
Change of use approved
68 decided
1,278
Total decisions
224 refused in the year to March 2026