Solar and renewables in Mid Kent

Mid Kent received 27 renewable energy applications in the last 12 months, including 3 battery storage sites and 5 heat pumps. Of the 11 decided so far, 10 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

11 last 90 days
|
3 last 30 days
|
0 last 14 days

Filter applications

Date received Last 90 days

Pick a year, or click two to span the range between them. Records before 2026 come from the archive.

Keywords in the address or description
Match

Literal text matches. For application types (extensions, solar, change of use...) use the categories above - no need to recreate them as keywords.

Showing 11 of 11 applications
26/502202/FULL 19 Jun 2026 Awaiting decision

Chegworth Mill Farm Chegworth Road Harrietsham Kent ME17 1DD

Change of use of the existing arable land to the south of Chegworth Mill Farm to allow for a Glamping Site, comprising 8no. seasonal glamping units al...

Full Mid Kent 19 Jun 2026
26/501678/EIFUL 19 Jun 2026 Awaiting decision

Land East Of Sheppey Way Minster-on-sea Kent ME12 3RR

Construction and operation of a solar photovoltaic (PV) farm and Battery Energy Storage System (BESS), including an underground cable connection to th...

EIA Full Application Mid Kent 19 Jun 2026
26/502255/EIFUL 17 Jun 2026 Awaiting decision

Land West Of Iwade Kent ME9 8QG

Section 73 - Application for minor material amendment to approved plans condition 2 (to allow changes to the site layout including removal of some are...

EIA Full Application Mid Kent 17 Jun 2026
26/502233/FULL 10 Jun 2026 Awaiting decision

2 Tower Lane Bearsted Kent ME14 4JJ

Section 73 - Application for Variation of Conditions (2 and 3) To change the window frames to black uPVC, install solar panels to the flat roof kitche...

Full Mid Kent 10 Jun 2026
26/502178/FULL 8 Jun 2026 Awaiting decision

82 King Edward Road Maidstone Kent ME15 6PL

Installation of air source heat pump to front of property.

Full Mid Kent 8 Jun 2026
26/502062/FULL 1 Jun 2026 Awaiting decision

57 Holland Road Maidstone Kent ME14 1UN

Section 73 - Application for Variation of condition 5 (to allow for the development shall be carried out and thereafter retained in accordance with th...

Full Mid Kent 1 Jun 2026
26/501962/PN14J 21 May 2026 Decided

Harts Holiday Park Leysdown Road Leysdown Kent ME12 4RG

Prior notification for the installation of solar PV panels to a single building on two separate sections. For its prior approval to: -Design and exter...

Notification for prior approval Part 14 Mid Kent 21 May 2026
26/501899/FULL 19 May 2026 Awaiting decision

Yew Tree House School Lane Iwade Kent ME9 8SG

Installation of air source heat pump.

Full Mid Kent 19 May 2026
26/501732/FULL 7 May 2026 Decided

Hertford House Chapel Street Faversham Kent ME13 8EP

Re-roofing of pitched roof incorporating solar tiles to south elevation and natural slate to north elevation.

Full Mid Kent 7 May 2026
26/501328/FULL 24 Apr 2026 Awaiting decision

Accomodation Keystun Ruins Barn Road Tunstall Kent ME9 8AA

Installation of a ground-mounted solar photovoltaic (PV) array.

Full Mid Kent 24 Apr 2026
26/501419/FULL 21 Apr 2026 Decided

2 Brogden Farm Cottages Old Mill Road Leeds Kent ME17 1RT

Erection of garden sheds, outdoor kitchen pod and railing and gates to front elevation. Terrace extension and installation of limestone paving and air...

Full Mid Kent 21 Apr 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Mid Kent

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Mid Kent?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Mid Kent. You can also narrow the alert to a postcode, street, or drawn area.

We check Mid Kent's planning portal daily. New solar & renewables applications appear here within a day of being published.