GHYLL HOUSE FARM, EGREMONT Data via plota.co.uk
Pending
4/26/2175/0F1
Description
CONVERSION OF EXISTING HAYLOFT AND DEMOLITION AND REPLACEMENT OF SINGLE STOREY BUILDING TO FORM AN EXTENSION TO THE EXISTING DWELLING HOUSE Data via plota.co.uk
Nearby new applications
Historical activity at this location
24 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
Approved
14-15 MARKET PLACE, EGREMONT
APPLICATION FOR CONSENT TO DISPLAY ADVERTISEMENT SIGNS
2025
Approved
14-15 MARKET PLACE, EGREMONT
APPLICATION FOR CONSENT TO DISPLAY ADVERTISEMENT SIGNS
2025
Approved
CUMBERLAND BUILDING SOCIETY, 46 MAIN STREET, EGREMONT
INSTALLATION OF 1X NON-ILLUMINATED FASCIA SIGN AND 1X NON-ILLUMINATED PROJECTING SIGN
2025
Approved
CUMBERLAND BUILDING SOCIETY, 46 MAIN STREET, EGREMONT
INSTALLATION OF 1X NON-ILLUMINATED FASCIA SIGN AND 1X NON-ILLUMINATED PROJECTING SIGN
2024
Approved
29 MARKET PLACE, EGREMONT
APPLIATION FOR CONSENT TO DISPLAY NEW ATM TABLET SIGN
2024
Approved
29 MARKET PLACE, EGREMONT
APPLIATION FOR CONSENT TO DISPLAY NEW ATM TABLET SIGN
2024
Approved
25 MARKET PLACE, EGREMONT
PRIOR APPROVAL FOR A CHANGE OF USE FROM COMMERCIAL TO COMMERCIAL AT GROUND FLOOR WITH RES…
2024
Approved
25 MARKET PLACE, EGREMONT
PRIOR APPROVAL FOR A CHANGE OF USE FROM COMMERCIAL TO COMMERCIAL AT GROUND FLOOR WITH RES…
2023
Approved
ST MARYS AND ST MICHAELS, CHURCH STREET, EGREMONT
LISTED BUILDING CONSENT FOR THE INSTALLATION OF 1 NO. GPS NODE, TO BE LOCATED EXTERNALLY…
2023
Approved
ST MARYS AND ST MICHAELS, CHURCH STREET, EGREMONT
INSTALLATION OF 1 NO. GPS NODE, TO BE LOCATED EXTERNALLY MOUNTED OFF AN UPGRADED ANTENNA…
2023
Approved
ST MARYS AND ST MICHAELS, CHURCH STREET, EGREMONT
LISTED BUILDING CONSENT FOR THE INSTALLATION OF 1 NO. GPS NODE, TO BE LOCATED EXTERNALLY…
2023
Approved
ST MARYS AND ST MICHAELS, CHURCH STREET, EGREMONT
INSTALLATION OF 1 NO. GPS NODE, TO BE LOCATED EXTERNALLY MOUNTED OFF AN UPGRADED ANTENNA…
2023
Approved
43 MAIN STREET, EGREMONT
REPLACE EXISTING WINDOW WITH NEW DOOR AND SIDE LIGHT
2023
Approved
43 MAIN STREET, EGREMONT
REPLACE EXISTING WINDOW WITH NEW DOOR AND SIDE LIGHT
2023
Approved
WAR MEMORIAL, MARKET PLACE, EGREMONT
LISTED BUILDING CONSENT FOR REPLACEMENT OF THE EXISTING WROUGHT IRON GATE WITH A NEW GATE…
2023
Approved
WAR MEMORIAL, MARKET PLACE, EGREMONT
LISTED BUILDING CONSENT FOR REPLACEMENT OF THE EXISTING WROUGHT IRON GATE WITH A NEW GATE…
2022
Approved
EGREMONT CASTLE, EGREMONT
REMOVE DEAD BRANCHES HANGING OVER PATH OF WEEPING ELM TREE; FELL 2 FIR TREES; FELL 2 BEEC…
2022
Approved
EGREMONT CASTLE, EGREMONT
REMOVE DEAD BRANCHES HANGING OVER PATH OF WEEPING ELM TREE; FELL 2 FIR TREES; FELL 2 BEEC…
2021
Approved
FORMER CASTLE CINEMA SITE, BOOKWELL, EGREMONT
RESIDENTIAL DEVELOPMENT TO CREATE FOUR DETACHED DWELLINGS
2021
Approved
FORMER CASTLE CINEMA SITE, BOOKWELL, EGREMONT
RESIDENTIAL DEVELOPMENT TO CREATE FOUR DETACHED DWELLINGS
2022
Approved
MAIN STREET, EGREMONT
TREE WORKS TO A LIME TREE
2022
Approved
MAIN STREET, EGREMONT
TREE WORKS TO A LIME TREE
2021
Approved
22-23 MARKET PLACE, EGREMONT
ERECTION OF BUILDING FOR USE AS A 5 BEDROOMED HOUSE IN MULTIPLE OCCUPATION UTILISING THE…
2021
Approved
22-23 MARKET PLACE, EGREMONT
ERECTION OF BUILDING FOR USE AS A 5 BEDROOMED HOUSE IN MULTIPLE OCCUPATION UTILISING THE…
Cumberland
Planning Authority Score
5.7/10
Average
#109 of 292 councils
Relevant to this application:
Householder decisions
Cumberland is slower than most councils at deciding householder applications, ranking #201 out of 292. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.
More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application.
View full council performance
Cumberland decision performance
Based on MHCLG data, 2025
97%
Overall approval rate
Above avg (87%) #2 of 292
98%
Householder approved
Above avg (90%) #9 of 292
56%
Decided in 8 weeks
Below avg (64%) #201 of 292
43%
Extended time limit
Above avg (40%) #167 of 292
85%
Minor dwellings approved
117 decided (1-9 homes)
100%
Major dwellings approved
22 decided (10+ homes)
97%
Change of use approved
89 decided
1,146
Total decisions
37 refused in 2025