Planning applications in Powys

9 last 90 days
|
0 last 30 days
|
0 last 14 days
Solar & renewables
Get alerts for Powys

Filter by application type

Showing 9 of 9 applications
26/0338/LBC 9 Apr 2026 Pending Consideration

The Old Mill Mill Lane Presteigne LD8 2ES

Installation of solar panels on roof of garage /workshop

Powys 9 Apr 2026
26/0337/HH 9 Apr 2026 Pending Consideration

The Old Mill Mill Lane Presteigne LD8 2ES

Installation of solar panels on roof of garage/workshop

Powys 9 Apr 2026
26/0230/HH 10 Mar 2026 Pending Consideration

Ger Y Nant Meifod Powys SY22 6DF

Installation of solar panels to rear roof and installation of Air Source Heat Pump to rear (retrospective)

Powys 10 Mar 2026
26/0094/FUL 10 Mar 2026 Pending Consideration

Upper Fachwen Tregynon Newtown SY16 3EU

Part retrospective application for the extension to existing agricultural building and installation of a biomass boiler

Powys 10 Mar 2026
25/1885/LBC 10 Mar 2026 Pending Consideration

Ger Y Nant Meifod Powys SY22 6DF

Retention of solar PV panels to rear roof and air source heat pump to rear

Powys 10 Mar 2026
26/0226/FUL 5 Mar 2026 Pending Consideration

Ground Floor And Lower Ground Floor (Former Bank) Crown Buildings 11 Broad Street Builth Wells Powys LD2 3AE

Change of use of ground floor and lower ground floor from a Bank (Class A2) to an Events Venue (Sui Generis) including use class D2 and A3 together wi...

Powys 5 Mar 2026
26/0255/FUL 2 Mar 2026 Pending Consideration

Glynhafren Old Hall Llanidloes Powys SY18 6PS

Erection of a replacement wind turbine together with all associated infrastructure and works (blade hub height 31.5, blade tip height 46m)

Powys 2 Mar 2026
26/0018/HH 12 Feb 2026 Pending Consideration

5 Ashfield Terrace Llanymynech SY22 6EU

IInstallation of roof mounted Solar PV panels

Powys 12 Feb 2026
26/0147/FUL 10 Feb 2026 Pending Consideration

Izzy's Butchers And Accompanying Area And Outbuildings Market Square Llanrhaeadr-ym-mochnant Oswestry Powys SY10 0JL

Conversion and change of use of existing outbuilding to cafe including installation of solar panels, installation of log burner and installation of cl...

Powys 10 Feb 2026
Recency
Last 2 weeks
2-4 weeks
1–2 months
Older

Get free email alerts for new planning applications in Powys

Set up alerts

Heads up: Powys hasn't published a new application since 15 Apr 2026 — 26 days ago. We've been checking daily and will surface new applications as soon as they appear on the council's portal.