Lluest Y Gwynt Wind Farm Close To The Village Of Ponterwyd East Of Aberystwyth Ceredigion Data via plota.co.uk

26/24616/DNS - Development of National Significance Decided

Proposal

Installation of a wind farm and grid connection, together with associated equipment, infrastructure and ancillary works: 1. To deregister an area of approximately 38.34 hectares on Drybedd Common (CL28) (in the Community of Ceiro, Ponterwyd) and provide replacement land of approximately 03.75 hectares (RLP1), 16.51 hectares (RLP2), 07.28 hectares (RLP3) and 11.2 hectares (RLP4) on four separate parcels of land in the Community of Ceiro, Ponterwyd. The release land is required to facilitate the construction and operation of the Lluest y Gwynt Wind Farm. 2. To deregister an area of approximately 15.05 hectares on Yr Ochrydd Common (CL84) (in the Community of Eisteddfa Gurig, Ponterwyd) and provide replacement land of approximately 01.69 hectares (RLP5) and 20.69 hectares (RLP6) on two separate parcels of land in the Community of Eisteddfa Gurig, Ponterwyd. The release land is required to facilitate the construction and operation of the Lluest y Gwynt Wind Farm. 3. To carry out restricted works on Drybedd Common (CL28), Banc Bwa-drain Common (CL75) and Yr Ochrydd Common (CL84) namely temporary open trenching with full reinstatement for the installation of underground cabling for a grid connection and temporary fencing for health and safety and animal welfare requirements and stock-proof fencing for the protection of peat restoration areas. Data via plota.co.uk

View original council record ↗

Application progress

Received
7 May 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet.

Documents 267

Statements & assessments 212

PDF Design and access statement SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 9-5 - baseline non breeding bird surveys 2025 summary report SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 9-4 - outline breeding bird protection plan SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 9-3 - ornithology hra SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 9-2 - collision mortality risk analysis SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 9-1 - ornithology report part 3 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 9-1 - ornithology report part 2 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 9-1 - ornithology report part 1 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-7 - outline habitat management plan SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-6 - ecology habitat regulations assessment hra SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-4 - other taxa report SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-3 - terrestrial mammals report SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-2 - bat report SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-1 - habitat and vegetation report part 6 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-1 - habitat and vegetation report part 5 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-1 - habitat and vegetation report part 4 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-1 - habitat and vegetation report part 3 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-1 - habitat and vegetation report part 2 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-1 - habitat and vegetation report part 1 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 7-4 - regression analysis figures SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 7-3 - time history figures SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 7-1 - calibration certificates SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-9 - cumulative visual effects SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-8 - night-time landscape and visual effects part 2 figures 4a-e SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-8 - night-time landscape and visual effects part 1 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-7 - rvaa SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-6 - effects on viewpoints SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-5 - effects on landscape character SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-4 - landmap filtering exercise SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-3 - special landscape areas SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-2 - visualisation methodolog SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-10 - comparative wireframes SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 6-1 - lvia methodology SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 5-3 - listed building consent hia SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 5-2 - grid connection detailed description SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 2-3 - scoping direction addendum 2023 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 2-2 - post scoping consultation SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 2-1 - full scoping direction 2020 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 16-1 - forestry site assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 14-1 - annex c SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 14-1 - annex b SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 14-1 - annex a SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 13-1 - lighting and mitigation report SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 12-4 - asidohl SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 12-3 - photographic records from the site visit SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 12-2b - non designated assets - grid connection SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 12-2a - non designated assets - wind farm SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 12-1 - heritage impact assessment methodology SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 11-6 - outline decommissioning plan SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 11-5 - outline borrow pit restoration plan SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 11-4 - soil management plan SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 11-3 - peat slide risk assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 11-2 - outline peat management plan SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 11-1 - carbon balance assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 10-7 - land quality assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 10-6 - gwdte assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 10-5 - water frameworks directive assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 10-4 - watercourse crossings assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 10-3 - private water supplies risk assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 10-2 - outline surface water drainage plan SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-7 d - non-breeding bird survey results SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-7 c - waterbird vantage point survey results - target species SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-7 b - non-breeding bird walkover survey 2025 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-7 a - waterbird vantage point survey 2025 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-4 e - target species yr 2 waders waterfowl and gulls SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-4 d - target species yr 2 kestrel and other raptors SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-4 c - target species yr 2 red kite SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-4 b - target species - other species SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-4 a - target species - red kite SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-3 - statutory designated sites SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-2 b - ornithology survey areas - grid connection SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-2 a - ornithology survey areas - wind farm SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-1 b - vantage points and viewsheds 30m offset SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 9-1 a - vantage points and viewsheds 10m offset SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 8-8 - updated phase 1 habitat survey SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 8-7 - site layout SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 8-6 - non statutory designated sites SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 8-5 - statutory designated sites SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 8-4 - phase 1 grid connection SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 8-3 - phase 1 habitat wind farm SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 8-2 - phase 1 habitat wind farm SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 8-1 - nvc pages 1 to 15 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 q - viewpoint 17 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 p - viewpoint 16 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 o - viewpoint 15 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 n - viewpoint 14 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 m - viewpoint 13 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 l - viewpoint 12 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 k - viewpoint 11 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 j - viewpoint 10 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 i - viewpoint 9 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 h - viewpoint 8 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 g - viewpoint 7 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 f - viewpoint 6 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 e - viewpoint 5 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 d - viewpoint 4 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 c - viewpoint 3 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 b - viewpoint 2 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-9 a - viewpoint 1 SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-8 c - cumulative ztv - operational consented and planning stage schemes SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-8 b - cumulative ztv - operational and consented schemes SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-8 a - cumulative ztv (operational schemes) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-7 b - cumulative schemes (10km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-7 a - cumulative schemes SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-6 c - hsa ztv (10km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-6 b - hsa ztv (20km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-6 a - hsa ztv (45km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-5 c - vsa ztv (10km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-5 b - vsa ztv (20km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-5 a - vsa ztv (45km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-4 c - blade tip ztv (10km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-4 b - blade tip ztv (20km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-4 a - blade tip ztv (45km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-3 c - hub ztv (10km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-3 b - hub ztv (20km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-3 a - hub ztv (45km radius) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-2 c - landmap visual & sensory aspect areas assessed in detail SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-2 b - landscape character (20km) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-2 a - landscape character (45km) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-12 a-g - photographs a-f SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-11 - grid connection route SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-10 a-q - 360 cumulative wires SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-1 c - landscape designations (5km) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-1 b - landscape designations (15km) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 6-1 a - landscape designations (45km) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 5-1-1 - wind farm site layout SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 5-1 - site layout SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 4-4 - grid connection route options SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 4-3 - site entrance options SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 4-2-4 - pac site layout SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 4-2-3 - previous layouts peat and nvc constraints SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 4-2-2 - peat and nvc constraints SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 4-2-1 -technical and environmental constraints SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 4-1-4 - preliminary layout 12 turbines SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 4-1-3 - preliminary layout 15 turbines SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 4-1-2 - preliminary layout 22 turbines SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 4-1-1 - preliminary layout 28 turbines SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 19-1 - shadow flicker properties SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 18-3 - proposed waymarked route SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 18-2 - common land SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 18-1 - public rights of way SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 16-5 - proposed felling SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 16-4 - nrw felling SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 16-3 - nrw baseline SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 16-2 - study area SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 16-1 - nrw longterm objectives SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 15-1 - socio economic study area SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 14-4 - abnormal load delivery route SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 14-2 - traffic count locations SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 14-1 - study area SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 12-6 - heritage trail SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 12-5a-j - grid connection and heritage assets SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 12-4 - ztv and designated assets SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 12-3 - hlca SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 12-2 - sm and lbs within 5km SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 12-1 - cultural heritage SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 11-5 - peat impact assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 11-4 - peat sensitivity SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 11-3c - surveyed peat depths SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 11-3b - surveyed peat depth SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 11-3a - surveyed peat depths SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 11-2 - phase 1 surveyed peat depths SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 11-1 - peatlands of wales SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 10-6 - hydrological constraints map SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 10-5 - nrw pluvial flood risk map SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 10-4 - nrw fluvial flood risk map SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 10-3 - surface water catchment and sub catchments SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 10-2b - bedrock geology SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 10-2a - superficial deposits SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 10-1 - site layout SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 1-1 - site location SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 8 - ecology SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 6 - landscape and visual impact assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 3 - legislative and policy framework SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 20 - in combination effects residual effects mitigation and enhancement SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 2 - environmental impact assessment process & methodology SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 19 - shadow flicker SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 16 - forestry SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 12 - archaeology and cultural heritage SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 1 - introduction SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement completeness report (english) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement completeness report (cymraeg) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 8-5 - pre-application validation survey and update data search report SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 7-6 - construction assessment tables SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 7-5 - assessment of effects figures SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 7-2 - survey installation photographs SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 5-1 - outline construction environmental management plan SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 14-1 - transport assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 12-5 - scheduled monument viewpoints SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 3 Appendix 10-1 - flood consequence assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 5-2 to 5-12 - civils infrastructure SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 5-1-2 - grid site layout SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 2 Figure 14-3 - personal injury accident locations SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 9 - ornithology SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 7 - noise assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 5 - description of proposed development SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 4 - site selection and project evolution SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 18 - other environmental issues SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 17 - air quality climate and carbon balance assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 15 - socio economic impact assessment SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 14 - transport and access SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 13 - aviation and telecommunications SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 11 - peat and soils SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - vol 1 Chapter 10 - hydrology hydrogeology and geology SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - non technical summary (english) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement - non technical summary (cymraeg) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement completeness report (english) SupportingDocs · 7 May 2026 View ↗ PDF Environmental statement completeness report (cymraeg) SupportingDocs · 7 May 2026 View ↗ PDF Planning statement SupportingDocs · 7 May 2026 View ↗ PDF Written statement on the installation of an electric line above ground SupportingDocs · 7 May 2026 View ↗ PDF Written statement about secondary consents SupportingDocs · 7 May 2026 View ↗ PDF Green infrastructure statement SupportingDocs · 7 May 2026 View ↗

Other documents 37

PDF To officer Admin email DevMon · 24 Jun 2026 View ↗ PDF Common land report SupportingDocs · 7 May 2026 View ↗ PDF Collaborative benefits report SupportingDocs · 7 May 2026 View ↗ PDF Cl84 unilateral undertaking SupportingDocs · 7 May 2026 View ↗ PDF Cl84 landowner letter of consent SupportingDocs · 7 May 2026 View ↗ PDF Cl75 landowner letter of consent SupportingDocs · 7 May 2026 View ↗ PDF Cl28 unilateral undertaking SupportingDocs · 7 May 2026 View ↗ PDF Cl28 landowner letter of consent SupportingDocs · 7 May 2026 View ↗ PDF Acceptance of notification notice SupportingDocs · 7 May 2026 View ↗ PDF Notiff004 - acceptance of notification SupportingDocs · 7 May 2026 View ↗ PDF Notiff003 - cover letter SupportingDocs · 7 May 2026 View ↗ PDF Notiff002 - site location SupportingDocs · 7 May 2026 View ↗ PDF Notiff001 - notification of development SupportingDocs · 7 May 2026 View ↗ PDF Eia scoping direction addendum SupportingDocs · 7 May 2026 View ↗ PDF Figure 3 - designations SupportingDocs · 7 May 2026 View ↗ PDF Figure 2 - development boundary for grid connection SupportingDocs · 7 May 2026 View ↗ PDF Figure 1 - site location SupportingDocs · 7 May 2026 View ↗ PDF 01 - scoping report addendum cover letter - july 2023 SupportingDocs · 7 May 2026 View ↗ PDF 00 - scoping report addendum SupportingDocs · 7 May 2026 View ↗ PDF 3246727 - lluest y gwynt - pre-application advice SupportingDocs · 7 May 2026 View ↗ PDF Dns 3246727 - scoping direction w. appendix SupportingDocs · 7 May 2026 View ↗ PDF Dns 3246727 - eia scoping report - redacted SupportingDocs · 7 May 2026 View ↗ PDF Plans accompanying scoping report SupportingDocs · 7 May 2026 View ↗ PDF Eia scoping request cover letter (redacted) SupportingDocs · 7 May 2026 View ↗ PDF Lluest y gwynt wind farm - inception meeting note SupportingDocs · 7 May 2026 View ↗ PDF Site notice (saesneg) SupportingDocs · 7 May 2026 View ↗ PDF Site notice (cymraeg) SupportingDocs · 7 May 2026 View ↗ PDF Reps001 - national gas transmission SupportingDocs · 7 May 2026 View ↗ PDF Exnote001 - acceptance notice SupportingDocs · 7 May 2026 View ↗ PDF Cl28 & cl84 s.16 plans SupportingDocs · 7 May 2026 View ↗ PDF Summary of the statements of common ground SupportingDocs · 7 May 2026 View ↗ PDF S.38 common land designations SupportingDocs · 7 May 2026 View ↗ PDF S.16 common land designations SupportingDocs · 7 May 2026 View ↗ PDF Pac report appendix 5 (part 3) SupportingDocs · 7 May 2026 View ↗ PDF Pac report appendix 5 (part 2) SupportingDocs · 7 May 2026 View ↗ PDF Pac report appendix 5 (part 1) SupportingDocs · 7 May 2026 View ↗ PDF Notice under article 16 SupportingDocs · 7 May 2026 View ↗

All documents on the council site ↗

Important details

Application type
Development of National Significance
Postcode
SY23
Received
7 May 2026
Validated
7 May 2026
Case officer
Track to view
Decision level
Fringe no comments

Consultation & key dates

Env. assessment
No