Peterhead, Persley And Kintore

Pending 260495/S37
Council
Date received
29 Apr 2026
Date validated
29 Apr 2026
Postcode
AB51 0FE

Description

Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV