Peterhead, Persley And Kintore
Pending
260495/S37
Description
Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV