WOODBERRY DOWN PRIMARY SCHOOL Woodberry Grove, Hackney, London, N4 1SY Data via plota.co.uk
Description
Refurbishment of kitchen area and surrounding offices/store rooms, dining hall and associated WCs following flooding. Includes stripping out of all modern fixtures and finishes, doors, installation of new cold rooms, plus re-decoration. replacement of 2 no. extract louvres, installation of 1 no. new metal louvre to a window frame, installation of 2no. condensers and pipework to dining hall flat roof. Internal mechanical and electrical works. Data via plota.co.uk
Other new applications on this street
Nearby new applications
Bus Shelter Pavement Outside Arena Shopping Park Finsbury Park London N4 1DT
Consent to display an LCD Bus Shelter Advertisement
WOODBERRY DOWN PRIMARY SCHOOL Woodberry Grove, Hackney, London, N4 1SY
Works associated with kitchen refurbishment, including installation of 2 no. enl...
JOHN SCOTT HEALTH CENTRE Green Lanes, Hackney, London, N4 2NU
Listed Building Consent for installation of a new roof guard-rail system
JOHN SCOTT HEALTH CENTRE Green Lanes, Hackney, London, N4 2NU
Installation of a new roof guard rail system
Drive Through Restaurant Green Lanes Hornsey London N4 1DR
Refurbishment of the restaurant with an extension for the introduction of an int...
Drive Through Restaurant Green Lanes Hornsey London N4 1DR
The introduction of an additional "Play Land" internally static illuminated appe...
Historical activity at this location
27 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Hackney is slower than most councils at deciding householder applications, ranking #237 out of 292. 47% of applications have the time limit extended, above the 40% national average. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).
