Church Farm Yockleton Road Cardeston Ford Shrewsbury Shropshire SY5 9NJ Data via plota.co.uk
Pending
26/02130/AG1
Description
Erection of a steel framed agricultural building for the storage of straw Data via plota.co.uk
Historical activity at this location
7 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
Within ~100m
Nearby activity
2025
Holiday Cottages No 1 And No 2 Church Farm Yockleton Road Cardeston Ford Shrewsbury Shropshire SY5 9NJ
Retrospective change of use of a converted traditional farm building to 2no Open Market d…
2024
Refused
Holiday Cottage No 1 And 2 Church Farm Yockleton Road Cardeston Ford Shrewsbury Shropshire SY5 9NJ
Variation of condition 1 and removal of condition 7 from planning permission reference SA…
2023
Approved
Church Farm Cottage Yockleton Road Cardeston Ford Shrewsbury Shropshire SY5 9NJ
Erection of a rear single storey extension to detached dwelling, dimensions 7.0 metres be…
2023
Refused
Church Farm Cottage Yockleton Road Cardeston Ford Shrewsbury Shropshire SY5 9NJ
Erection of a single storey extension to detached dwelling. Dimensions 7.00 meters beyond…
2023
Approved
Church Farm Cottage Yockleton Road Cardeston Ford Shrewsbury Shropshire SY5 9NJ
Erection of two storey side extension including juliet balcony at first floor and alterat…
Shropshire
Planning Authority Score
7.3/10
Good
#46 of 292 councils
Relevant to this application:
Householder decisions
Shropshire is faster than most councils at deciding householder applications, ranking #42 out of 292. Only 27% of applications have the time limit extended, well below the 40% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).
Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application.
View full council performance
Shropshire decision performance
Based on MHCLG data, 2025
87%
Overall approval rate
Above avg (87%) #175 of 292
92%
Householder approved
Above avg (90%) #153 of 292
80%
Decided in 8 weeks
Above avg (64%) #42 of 292
27%
Extended time limit
Below avg (40%) #42 of 292
70%
Minor dwellings approved
340 decided (1-9 homes)
67%
Major dwellings approved
33 decided (10+ homes)
84%
Change of use approved
25 decided
2,039
Total decisions
265 refused in 2025
