Old Oak Common Lane (between Wells House Road And Wormwood Scrubs) London NW10 6DZ
Description
Application under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017, for works related to the replacement Great Western Mainline Bridge; a new bridge to non-preclude a potential future extension of the Chiltern Line; collision protection beam; modifications to abutments of the existing Intercity Express Programme Bridge; and associated earthworks and fencing. (Out of borough)
Ealing is one of the slowest councils in England for householder decisions, ranking #263 out of 292. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).
Nearby applications
Footway outside 1 Wells House Road, close to the junction of Wells House Road and Old Oak Common Lane, London, NW10
Erection of an eco sculpture.
52 Mellitus Street,London,Hammersmith And Fulham,W12 0AS
Erection of a single storey rear extension (extending 6 metres beyond the rear w...
25 Wells House Road, Park Royal, Ealing, NW10 6ED
Loft conversion with rear dormer extension and rear roof extension, and installa
28 Long Drive Acton W3 7PR
Replacement of windows, external doors, fixtures and fittings including front en...
22 Long Drive Acton W3 7PR
Replacement of windows, external doors, fixtures and fittings including front en...
205 Old Oak Common Lane Acton W3 7DX
G1 mixed species group including Maple, Prunus, Ash, Birch - to laterally reduce...