Flat 5, 69 Holland Park, London, W11 3SL
Description
Internal refurbishment to convert existing bathroom to a bedroom and general repair and refurbishment to entire flat including new flooring and paint
Kensington and Chelsea ranks #186 out of 292 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).
Other applications on this street
12 Holland Park, London, W11 3TH
Internal alterations, including to room layouts, floor level changes and refurbi...
12 Holland Park, London, W11 3TH
Internal alterations, including to room layouts, floor level changes and refurbi...
Flat A, 61 Holland Park, London, W11 3SJ
Details required by conditions 3 (trees and landscaping details), 4 (CTMP), 5 (a...
79 Holland Park, London, W11 3SW
Retention and completion of internal alterations to upper-floor residential acco...
Nearby applications
12 Holland Park, London, W11 3TH
Internal alterations, including to room layouts, floor level changes and refurbi...
12 Holland Park, London, W11 3TH
Internal alterations, including to room layouts, floor level changes and refurbi...
18 Clarendon Road, London, W11 3AB
Survey and repair of staircase with fabric replacement
Ground Floor Flat, 33 Kensington Park Gardens, London, W11 2QS
Retention of relocated kitchen and bathroom, change to internal partition wall a...
118 Woodsford Square, London, W14 8DT
Installation of an air conditioning condenser on the roof
24 Upper Phillimore Gardens, London, W8 7HA
Prune 1 x Magnolia (front)