Land East Of Meadow View Cheneys Lane Tacolneston Norfolk Data via plota.co.uk
Pending
2026/1035
Description
Outline planning permission for the erection of 2no self build dwellings including vehicular access and associated works, with all other matters reserved Data via plota.co.uk
Historical activity at this location
8 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2024
With conditions
St Marys Farm Cheneys Lane Tacolneston Norfolk NR16 1DB
Installation of ground-level photo-voltaic cells, underground cable to outbuildings, inst…
2024
With conditions
St Marys Farm Cheneys Lane Tacolneston Norfolk NR16 1DB
Installation of ground-level photo-voltaic cells to produce electricity, underground cabl…
2024
With conditions
St Marys Farm Cheneys Lane Tacolneston Norfolk NR16 1DB
Installation of ground-level photo-voltaic cells, underground cable to outbuildings, inst…
2024
With conditions
St Marys Farm Cheneys Lane Tacolneston Norfolk NR16 1DB
Installation of ground-level photo-voltaic cells to produce electricity, underground cabl…
2021
With conditions
St Marys Farm Cheneys Lane Tacolneston NR16 1DB
Reconfigure ground floor room arrangement at entrance to west end of house - existing lob…
2021
With conditions
St Marys Farm Cheneys Lane Tacolneston NR16 1DB
Reconfigure ground floor room arrangement at entrance to west end of house - existing lob…
2021
With conditions
St Marys Farm Cheneys Lane Tacolneston NR16 1DB
Reconfigure ground floor room arrangement at entrance to west end of house - existing lob…
2021
With conditions
St Marys Farm Cheneys Lane Tacolneston NR16 1DB
Reconfigure ground floor room arrangement at entrance to west end of house - existing lob…
South Norfolk Broadland
Planning Authority Score
6.4/10
Average
#81 of 292 councils
Relevant to this application:
Householder decisions
South Norfolk Broadland ranks #117 out of 292 councils for householder decision speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).
These figures are council-wide context, not a prediction for this application.
View full council performance
South Norfolk Broadland decision performance
Based on MHCLG data, 2025
94%
Overall approval rate
Above avg (87%) #31 of 292
96%
Householder approved
Above avg (90%) #45 of 292
70%
Decided in 8 weeks
Above avg (64%) #117 of 292
41%
Extended time limit
Above avg (40%) #153 of 292
83%
Minor dwellings approved
137 decided (1-9 homes)
88%
Major dwellings approved
17 decided (10+ homes)
97%
Change of use approved
35 decided
1,050
Total decisions
63 refused in 2025
